Service Time

7*24H Service hotline

Call Us

+86-13585569799

how many cubic feet of rubble stone in one hand

How much force is needed to break a cubic meter of stone?

Tension pressure of rock varies from 18 Megapascals for limestone to 66 Megapascals for highly compressed sandstone. You can break it by using the old and well known method of wood wedges inserted into cracks in the rock: once you wet the wedges, ...

Stone Plus | Material Calculators

If you are still unsure how much bagged or bulk material to get provide the measurements to the KLS staff and they can help you estimate. There are 54 bags of stone or soil per 1 cubic yard. There are 27 1 cubic foot bags or 18 1.5 cubic foot bags of mulch per yard.

Calculate Rip Rap 3"

Type in inches and feet of your project and calculate the estimated amount of Rip Rap / Boulders in cubic yards, cubic feet and Tons, that your need for your project. The Density of Rip Rap 3" - 8" - Gabion/Surge Stone: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t

How to Measure for Landscape Rock | eHow

 · eHow may earn compensation through affiliate links in this story. Landscape rock, sometimes known as decorative rock, can make a delightful addition to , or landscape. It adds diversity of texture and color, along with a sense of gravity, to plantings such as flowers, trees, shrubs, and ...

The Cobblestone Museum – Cobblestone Masonry

Perch – 16 ½ cubic feet of rubble stone Cord – 99 cubic feet of stone in the wall Joint – The division between the stones; there are two kinds horizontal and vertical Pointing – the process of filling joints with mortar Bead –Projecting ½ circle of mortar about 1" wide to

Calculate Rip Rap 3"

Calculate Rip Rap 3" - 8" - Gabion/Surge Stone. Type in inches and feet of your project and calculate the estimated amount of Rip Rap / Boulders in cubic yards, cubic feet and Tons, that your need for your project. The Density of Rip Rap 3" - 8" - Gabion/Surge Stone: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. A:

Calculator

Plaster Sand. 0.1 m³. AfriSam All Purpose Cement 42,5N (50kg) 0.1 bags. We also offer a hassle-free drymixed plaster, PLASTERPRO in a 25kg bag = 1m 2 plaster coverage at 15mm thick. Only available in Gauteng. Enquire on 0860 141 141 Please note: Wastage of 5% to be allowed.

Conversion Guide | Centenary Landscaping Supplies

To find out how many Tonnes of a particular product you will need for your project, and to use this guide just multiply the Volume required (Cubic Metres) by the Conversion Rate (Bulk Density). For example, if you needed 3m 3 River Pebble 10mm, which has a 1.5 Tonne Bulk Density, you would multiply 3 x 1…

Gravel Stone

Basically gravel is a mixture of sand and stone. It can be limestone, quarz or granite. Gravel comes is many shapes and colors. Gravel is dug up from sand mines or broken down in quarrys. Sand mine and rock quarrys are areas where there are large quantities of gravel and stone close the earths surface.

Riprap – RR

Table 1 Non-Machined Riprap Specifications Rubble-stone Rubble-stone Sacked riprap (plain) (grouted) (sand-cement) Min 2" diameter Min 2" diameter Rectangular shapes Approx 1 cubic ft (min 0.5 lbs) (min 0.5 lbs) (approx. 100 Ibs) 80% by weight shall 80%

How much cement, sand, and stone is in 1 cu.m of stone masonry? …

Suppose if you are carrying out the RRMaonry stone work in cement mortar 1:6,then you require the following materials for one cum of such stone masonry:- RR STONE one cum+ Bond stone 0.01cum; cement mortar 1:6 0.34 cum [ i.e River sand 0.34cum and...

Mass, Weight, Density or Specific Gravity of Bulk Materials

As 1000kg of pure water = 1 cubic metre, those materials under 1000kg/cu.m will float; more dense will sink ie. those materials with a specific gravity more than 1. Pure water was chosen as the ''base line'' for specific gravity and given the value of 1.

Costs and Installation Tips When Building a Riprap Barrier

 · A 2:1 ratio is generally the steepest a slope should be when using riprap. This means the slope should extend horizontally at least 2 feet for every 1 foot of drop. In other words, if the horizontal distance from the top edge of the slope to the bottom of the slope is 100 feet, the height from the bottom of the slope to the top should be no more than 50 feet.

House construction materials rate in kerala | current market …

 · Quari Waste ( Mix of mud and rock pieces): 18 / Cubic Feet. Crusher Waste ( Mix of Rock Powder and broken Stone): 19/ Cubic Feet. Red Brick Prices are different for different locations. The rate given below are approximate and there be will slight changes depends on transportation. Red Brick Prices: 6.50 / Bricks.

Rate Analysis of Excavation in Earthwork -Calculate Excavation Cost

Then its capacity considered is ( (1x10)/0.04125) = 242.4242 m 3 / day. That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as: No. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days.

How to Calculate Cement, Sand and Aggregate required for 1 cubic …

So, 1 bag of cement produces = 400/2400 = 0.167 cum No. of bags required for 01 cum of concrete = 1/0.167 = 5.98 bags ~ 6 bags From above, if the concrete mix is 1:2:4, to get a cubic meter of concrete we require 1.Cement = 6 bags = 300 kgs. 2 ne

Dumpster Weight Calculators for Demolition Debris | Budget …

On average, a cubic yard of solid concrete weighs 4,050 pounds (~2 tons), or 150 pounds per cubic foot. Solid asphalt weighs slightly less at 3,960 pounds per cubic yard. However, broken concrete and asphalt weighs closer to 2,025 pounds (~1 ton) per cubic yard, or 75 pounds per cubic foot, when disposed of in a dumpster due to the amount of empty space.

Rubble Stone at Best Price in India

Rubble is broken stone, of irregular size, shape and texture; undressed especially as a filling-in. Rubble naturally found in the soil is known also as ''brash'' (compare cornbrash).[1] Where present, it becomes more noticeable when the land is ploughed or worked.

Gravel Calculator

It should help you estimate the amount of stone you will need. The depth will depend on the size of the material as well as its intended use. To calculate an area using our aggregate calculator, first choose the unit of measurement on the left hand side, the default is kilograms and metres but this can be changed to tonnes/feet.

How to Calculate Gravel for French Drains | Hunker

Step 5. Deduct the volume of the pipe from the volume of the trench. The result is the volume of gravel required to fill the drain. Gravel is sold in cubic feet or cubic yards, so round the value up to the nearest whole unit. One cubic yard of gravel is 27 cubic feet. Advertisement.

Garbage, rubbish volume to weight conversion

1 cubic foot of Garbage, rubbish weighs 30.02785 pounds [lbs] Garbage, rubbish weighs 0.481 gram per cubic centimeter or 481 kilogram per cubic meter, i.e. density of garbage, rubbish is equal to 481 kg/m³. In Imperial or

Concrete Weight Calculator | Dumpsters

How Much Concrete Can Fit in a Dumpster? In most locations, you can load up to 10 tons (20,000 pounds) of concrete into one of our concrete disposal dumpsters.*Since just one cubic yard adds up to over 4,000 pounds, we recommend calculating the weight of

Rubble stone masonry

 · How much stone is needed for a stone wall? To figure out how much stone you''ll need, multiply your wall''s height times the depth times the length. If your wall is 2 feet high, 1-1/2 feet wide, and 20 feet long, you''ll need roughly 60 cubic feet of stone . Is stone

Convert Ton Register to Cubic Foot

Instant free online tool for ton register to cubic foot conversion or vice versa. The ton register [ton reg] to cubic foot [ft^3] conversion table and conversion steps are also listed. Also, explore tools to convert ton register or cubic foot to other volume units or learn more

How many tonnes are in 1 cubic meter of stone aggregate?

For this you have to calculate the bulk density of aggregate plus also you have to consider the air cavity and other things… normally the bulk density of aggregates r about 1.6 to 1.8 kg/m2 this for 1 cubic meter aggregate should be weight about 1...

How Much Stone Do I Need to Build a Wall?

 · 20 feet x 2 feet x 3 feet = 120 feet. 120/27 = 4.44 cubic yards of stone. You would need a little less than 4 1/2 yards of stone to build your stone wall. But round up and buy at least 5 yards. If you can afford it, get 6 or even 7 yards. You can use any leftover stone that you have in a variety of other landscaping projects, ranging from water ...

Metric calculator for concrete

click here for our Imperial calculator. These Concrete Calculators provide the required quantities of cement and all-in ballast or cement, sharp sand and gravel required to give a defined volume of finished concrete. Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete.

How Many Dumpsters Are Needed to Demolish a House? | …

Determine how many dumpsters are needed for a demolition project with the help of our easy formulas and examples. Calculate cubic yards of C&D debris and get a rough estimate of how much it will cost to dispose of your project''s debris.

Working Out Material Volumes | Materials Volume Calculator | …

Working out Material Volumes; Use this building materials calculator to work out how much concrete or soil you need for your next building project. Put in the dimensions and then press ''calculate'' and you will immediately know the amount of any particular material you need to order, be it sand, gravel or MOT Type 1 scalpings.

Construction Board of Engineers & Contractors: January 2020

 · Rubble Soling Measurements are to be taken as per the following procedure. 1 Calculate the Area of Soling. 2 Check the Unit of BOQ which may be Square meter, Cubic meter, Sqft or Cubic feet. 3 If Unit is Square meter or Sqft then only calculate length and width of soling completed area.

How many bags of cement and sand and aggregate are in one cubic …

 · #cementsandandaggregate are in 1 cubic meter?

Stone, crushed volume to weight conversion

Stone, crushed weighs 1.602 gram per cubic centimeter or 1 602 kilogram per cubic meter, i.e. density of stone, crushed is equal to 1 602 kg/m³. In Imperial or US customary measurement system, the density is equal to 100.0096 pound per cubic foot [lb/ft³], or 0.92601 ounce per cubic inch [oz/inch³] .

void volume 3/4 crushed stone"

 · convert cubic yards to tons crushed stone – Grinding Mill China Depending upon the stone size there is a considerable void volume. In smaller crushed stone, … How Many Tons In 1 Cubic Yard Of 3/4" Crushed Stone? – Blurtit. »More detailed

Concrete 1 cubic foot volume to Metric tonnes converter

One cubic foot of concrete converted to tonne (Metric) equals to 0.068 t. How many Metric tonnes of concrete are in 1 cubic foot? The answer is: The change of 1 cu ft - ft3 ( cubic foot ) unit of concrete measure equals = to 0.068 t ( tonne (Metric) ) as the equivalent measure for the same concrete type. In principle with any measuring task ...

Concrete Curb Calculator

Adding just 1 gallon of water per cubic yard can decrease compressive strength 150 to 200 psi, and increase shrinkage by 10%. This is especially a problem for concrete that might be exposed to freezing and thawing conditions.

Hardcore MOT : Timberlink .uk

Hardcore MOT can be provided either loose and tipped, in bulk bags with the use of a crane or in 20kg bags for smaller areas. All calculations are approximations based on the information you have entered. Results may vary and more of the product may be required.

How To Build A Dry Stone Wall

How To Build A Dry Stack Stone Wall (cont''d) Drainage aggregate: Assuming a 12" wide drainage system. Multiply the length of the wall by the width of the drainage aggre-gate by the height of the wall to get the cubic footage. There are 27 cubic feet in one cubic yard so

Gravel Calculator

Gravel Calculator – How much gravel do I need When it comes to a new gravel, slate or other aggregate surface, understanding what quantities you need is very important. Too few aggregates can lead to additional deliveries, which can waste time and money. Too ...